Cooling Solutions

Local authority seeks permanent climate control arrangement

When a Sussex-based local authority sought a permanent air conditioning system for their offices and meeting rooms, Andrews were contacted and asked to put forward the best solution available. The initial phase involved a regional technician meeting with the client and their planning officer to help ascertain the most appropriate place for condensers and pipework to be located.

Cooling and heating equipment was required on two separate floors but because of the type of building, would have to be installed towards the rear of the property away from public access. This therefore meant that all pipework would have to pass through a part of the building not owned by the council, making the assignment slightly more challenging than usual. read more

Andrews Sykes Featured In Executive Hire News

EHN

The September issue of Executive Hire News features Andrews Sykes no less than 3 times throughout the magazine plus the issue includes a 4 page bound insert promoting our flood damage related services. With extreme weather conditions seeming to occur more frequently, this issue includes a Market Report focusing on Flood Damage Restoration Equipment and the important role hirers play in the resultant clear-up operations. Click here to see the electronic version of the magazine.