Mitsubishi Variable Refrigerant Flow

Preschool facility seeks air conditioning upgrade

The expansion of a building requires a number of logistical factors to be considered – including the installation of additional air conditioning equipment to ensure a greater cooling capacity is provided. So when a children’s nursery in Berkshire opted to increase the size of their existing premises rather than relocate to a new site, Andrews Air Conditioning were contacted to help make the transition as smooth as possible.

As the original supplier of cooling services prior to the development, we were asked to recommend an appropriate arrangement that would cater for an extended ground floor as well as private offices directly above. read more