Healthcare centre requires emergency air conditioning equipment
Andrews Air Conditioning were recently contacted by a local health care centre in search of an effective climate control solution for their server room.
Our specialists visited site within hours of receiving the enquiry to conduct a free site survey and provide the client with a permanent cooling solution to ensure the correct environment is maintained to protect the sensitive hardware contained within the server room.
After consultation with the client and site survey it was identified that the server room would require 3.5kw of cooling to maintain an even low temperature required to maximise the performance of their servers and safe the health centre critical systems. As a result, a Daikin high wall system was deployed and installed in the affected area.